Customization: | Available |
---|---|
Installation Method: |
Horizontal |
Operation Type: |
Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application field
1)Suitable for collecting a mass of floating dust in large area.
2)Apply to the big central dust collection system which has multistage, such as welding, grinding, polishing, cutting, drilling and so on.
3)Apply to the work condition which needs to recycling large amount of dust or particles, such as cutting, packing, grinding, spraying, powering, organic glass processing, car manufacturing, etc.
Specialty
1.Compact structure
It's floor space is much smaller than those bag filter vacuum cleaner by collecting the same quantity dust. What's more, VH-Z series equipment has much higher filtering efficiency, smaller running resistance, easier to be installed and moved. It's the best choice in large dust cleaning systems.
2.Easy to use and maintain.
The board door of cartridge using handle control switch which can ensure the tightness and also be convenient to open the door to see the cartridge usage.
It can be equipped with a negative pressure meter to monitor the operation situation of the machine.
Use large capacity container with caster, and have a fixed method of opening & closing the dust collector to make sure the airtightness and easy to cleaning.
3.High efficiency & reliable
Add a spoiler in the inlet to clean the dust in advance,and no need to equip the front cyclone device or spark trap. So it can reduce the cost generated by operating. And also reduce the speed of wind and improve the filtering efficiency.
Technical parameter
Parameter,Model | DMC-32 | DMC-48 | DMC-64 | DMC-80 | DMC-96 | DMC-112 | ||||||||||
Filtration Area(Square meter) | 24 | 36 | 48 | 60 | 72 | 84 | ||||||||||
Filter wind speed(m/min) | 1.04~1.67 | 1.15~1.62 | 1.21~1.74 | 1.25~1.67 | 1.27~1.62 | 1.28~1.68 | ||||||||||
Airflow(cubic meter/h) | 1500~2400 | 2500~3500 | 3500~5000 | 4500~6000 | 5500~7000 | 6500~8500 | ||||||||||
Filter bags(pcs) | 32 | 48 | 64 | 80 | 96 | 112 | ||||||||||
Air consumption(cubic meter/min) | 0.032 | 0.048 | 0.064 | 0.08 | 0.096 | 0.11 | ||||||||||
Inlet concentration(g/Cubic meter n) | 200 | |||||||||||||||
Exit concentration(mg/cubic meter n) | 50 | |||||||||||||||
Injection pressure(MPa) | 0.5~0.7 | |||||||||||||||
Negative pressure (Pa) |
5000 | |||||||||||||||
Equipment resistance(Pa) | ≤1200 | |||||||||||||||
Pulse valve | Specification | 1" | ||||||||||||||
Quantity(pcs) | 4 | 6 | 8 | 10 | 12 | 14 | ||||||||||
Motor model and power | Y90S-2 | Y90L-2 | Y100L-2 | Y132S1-2 | Y132S1-2 | Y132S2-2 | ||||||||||
(KW) | 1.5 | 2.2 | 3.0 | 5.5 | 5.5 | 7.5 | ||||||||||
Weight | DMC(A) | 1350 | 1620 | 1850 | 2360 | 2800 | 3200 | |||||||||
DMC(B) | 1220 | 1470 | 1670 | 2150 | 2540 | 2880 |
Technical support
Upon receiving the deposit, we will offer the following technical services:
1. Design for your production line flow and equipment layout, free of charge;
2. Provide foundation drawings of customer-ordered grinding mills and drawings of related parts, etc;
3. Technical parameters of peripheral equipment will be supplied;
4. Free technical suggestions on adjusting of equipment layout and application.
5. Equipment upgrading (customers need to pay the cost);
Quality assurance
1. Strictly conforming to ISO9001-2000 quality management system;
2. Strict control from purchasing inspection, process inspection to final proofing;
3. Established several QC departments to execute quality control regulations;
4. Detailed quality control examples:
(1) Complete files for quality control and quality feedback;
(2) Strict inspection for the components of our grinding mills, to assure products free of damage and avoid rust-eaten and paint peeling off later on.
(3) Only qualified components will be assembled and total equipment must be inspected completely before sale.
After sale service
1. We will send our technician to the site for guiding equipment installation and commissioning.
2. During the installation and commissioning, we offer operator training service.
3. The quality assurance date is one year after commissioning. And after that, we will collect the cost if provide repairing for your equipment.
4. Maintenance for equipment failure caused by improper handling (appropriate cost will be collected).
5. We offer the components with favorable price and perdurable maintenance.
6. If equipment repairing is needed after quality assurance date is expired, we will collect maintenance cost.