9-19 NO.5.6A Industrial centrifugal air blower fan
high pressure centrifugal fan is featured by high blast pressure, high efficiency, compact structure and strong operational reliability which is widely used in high pressure forced ventilation such as in forging and smelting furnace.
Technical Parameter
Model |
Wheel Dia.(mm) |
RPM (R/min) |
Power(kw) |
Air Capacity(m3/h) |
Air pressure(Pa) |
9-19-4A |
400 |
2900 |
2.2 |
824-1264 |
3584-3597 |
3 |
824-1704 |
3584-3253 |
9-19-4.5A |
450 |
2900 |
4 |
1174-2062 |
4603-4447 |
5.5 |
1174-2504 |
4603-4112 |
9-19-5A |
500 |
2900 |
7.5 |
1610-3166 |
5697-5323 |
11 |
1610-3488 |
5697-5080 |
9-19-5.6A |
560 |
2900 |
11 |
2262-3619 |
7182-7109 |
18.5 |
2262-4901 |
7182-6400 |
9-19-6.3A |
630 |
2900 |
18.5 |
3220-5153 |
9149-9055 |
30 |
3220-6978 |
9149-8148 |
FAQ
We will appreciate it a lot if you can offer us your product performance requirements and operation environment, so that we can customize optimal production to meet your every requirement.
(1) Air volume
(2)Total Pressure or Static Pressure
(3)Voltage and Frequency
(4)Medium Temperature and Density
(5)Altitude of Operation Place
We know that a good and satisfying powder grinding mill manufacturer and supplier should not only provide high quality products,but also complete customer services.
We provide the following services:
Technical support
Upon receiving the deposit,we will offer the following technical services:
1.Design for your production line flow and equipment layout,free of charge;
2.Provide foundation drawings of customer-ordered grinding mills and drawing of related parts,etc;
3.Technical parameters of peripheral equipment will be supplied
4.Free technical suggestions on adjusting of equipment layout and application
5.Equipment upgrading(customers need to pay the cost);
Quality assurance
1.Strictly conforming to ISO9001-2000 quality management system.
2.Strict control from purchasing inspection,process inspection to final proofing;
3.Establish several QC departments to execute quality control regulations;
4.Detailed quality control examples;
1)Complete files for quality control and quality feedback.
2)Strict inspection for the components of our grinding mills,to assure products free of damage and avoid rust-eaten and paint peeling off later on.
3)Only qualified components will be assembled and total equipment must be inspected completely before sales.After sales service
1.We will send our technician to the site for guiding equipment installation and commissioning
2.During the installation and commissioning,we offer operator training service
3.The quality assurance date is one year after commissioning,and after that, we will collect the cost if provide repairing for your equipment.
4.Maintenance for equipment failure caused by improper handling(appropriate cost will be collected).
5.We offer the components with favorable price and perdurable maintenance.
6.If equipment repairing is needed after quality assurance date is expired,we will collect maintenance cost.
Our Main Products
Working Principle
Air classifier mill material would be conveyed by feeding system evenly to milling chamber, and would be impacted by highspeed rotating beater, and also under the centrifugal force, it would impact the grinding track. By several different pulverization powers, the material would be milled into fine powder. The milled powder would go with air flow up to the classifying chamber. With the help of adjustable classifier wheel,coarsepowder and fine powder would be separated. Qualified fine powder would go through the wheel vane then into the cyclone separator or dust collector, while mixture of coarse powder and fine powder would fall down to themilling chamber to be milled again.
Technical Parameter
MODEL |
ACM-5 |
ACM-15 |
ACM-30 |
ACM-50 |
ACM-60 |
ACM-100 |
ACM-120 |
Parameter\ |
Matched Powder(kw) |
Grinding Plate |
4 |
11 |
22 |
30 |
45 |
90 |
110 |
Classifying wheel |
0.75 |
0.75 |
4 |
5.5 |
7.5 |
11 |
15 |
Feeder |
0.35 |
0.37 |
0.55 |
0.55 |
0.55 |
1.1 |
1.1 |
Air Flow(m3/h) |
250-500 |
1200-2000 |
2200-3600 |
3500-5500 |
4000-7500 |
7500-15000 |
9000-18000 |
Rotation Speed (r/min) |
Grinding plate |
9000 |
5600 |
4600 |
4200 |
2900 |
2100 |
1800 |
Classifying wheel |
900-3500 |
750-2800 |
700-2800 |
650-2600 |
600-2400 |
500-2000 |
400-1800 |
Pulverizatin Fineness(μm) |
5-300 |
Dimension(l×w×h)mm |
690×690×770 |
1300×650×750 |
1640×960×1030 |
2000×1200×1300 |
2000×1200×1300 |
2400×1500×1600 |
2400×2200×2600 |
N.W(kg) |
300 |
600 |
1000 |
1600 |
2000 |
3000 |
3500 |
Work Included
Design and supply of a ACM Complete Milling system for the production .This includes design and supply of all ancillary items necessary for proper operation of the offered equipment including, but not limited to:
- Feed Bin and Feed Screw
- ACM-60 Pulverizing Mill
- Cyclones
- Bag filters/pulse dust collector with rotary valve
- Draft Fan
- Pipes /bracket
- One product collection systems with rotary valve
- Electrical Cabinet
Flow Chart ( ACM-60)
Related Engineering Cases
Technical support
Upon receiving the deposit, we will offer the following technical services:
1. Design for your production line flow and equipment layout, free of charge;
2. Provide foundation drawings of customer-ordered grinding mills and drawings of related parts, etc;
3. Technical parameters of peripheral equipment will be supplied;
4. Free technical suggestions on adjusting of equipment layout and application.
5. Equipment upgrading (customers need to pay the cost);
Quality assurance
1. Strictly conforming to ISO9001-2000 quality management system;
2. Strict control from purchasing inspection, process inspection to final proofing;
3. Established several QC departments to execute quality control regulations;
4. Detailed quality control examples:
(1) Complete files for quality control and quality feedback;
(2) Strict inspection for the components of our grinding mills, to assure products free of damage and avoid rust-eaten and paint peeling off later on.
(3) Only qualified components will be assembled and total equipment must be inspected completely before sale.
After sale service
1. We will send our technician to the site for guiding equipment installation and commissioning.
2. During the installation and commissioning, we offer operator training service.
3. The quality assurance date is one year after commissioning. And after that, we will collect the cost if provide repairing for your equipment.
4. Maintenance for equipment failure caused by improper handling (appropriate cost will be collected).
5. We offer the components with favorable price and perdurable maintenance.
6. If equipment repairing is needed after quality assurance date is expired, we will collect maintenance cost.