Pellet Mill ,Crusher, Pulverizer
Description for crusher plant
Crushing system
1)Using large-diameter hammer blade crusher, wide adaptability to raw materials; installed in the pit, convenient feeding, low labor intensity; strong magnetism at the inlet;
2) The crushed material is discharged by high-pressure fan pneumatic conveying, which can not only ensure the reliability of material transport, but also improve the crushing efficiency;
3)With cloth bag dust collector, the dust removal effect is good.
Equipment list
No |
Name |
Model |
Quantity |
Power (kw) |
Remark |
01 |
Ring die pellet mill |
FSP60 |
1 |
22 |
Iron removal device with strong magnetic |
02 |
Air Blower |
9-26-4A |
1 |
5.5 |
Air flow:2198-3215m³/h,pressure:3852-3407Pa |
03 |
Cyclone |
D=600 |
1 |
0 |
55-1 |
04 |
Rotary valve |
TGFY7L |
1 |
0.75 |
Air lock discharge device |
05 |
Filter bags dust collector |
16pcs |
1 |
0 |
Filter area: 30m3,air flow: 6000-9000m³/h |
06 |
Pipes |
|
1 |
0 |
|
07 |
Electrical control device |
|
1 |
0 |
|
Related Engineering Cases
Technical support
Upon receiving the deposit, we will offer the following technical services:
1. Design for your production line flow and equipment layout, free of charge;
2. Provide foundation drawings of customer-ordered grinding mills and drawings of related parts, etc;
3. Technical parameters of peripheral equipment will be supplied;
4. Free technical suggestions on adjusting of equipment layout and application.
5. Equipment upgrading (customers need to pay the cost);
Quality assurance
1. Strictly conforming to ISO9001-2000 quality management system;
2. Strict control from purchasing inspection, process inspection to final proofing;
3. Established several QC departments to execute quality control regulations;
4. Detailed quality control examples:
(1) Complete files for quality control and quality feedback;
(2) Strict inspection for the components of our grinding mills, to assure products free of damage and avoid rust-eaten and paint peeling off later on.
(3) Only qualified components will be assembled and total equipment must be inspected completely before sale.
After sale service
1. We will send our technician to the site for guiding equipment installation and commissioning.
2. During the installation and commissioning, we offer operator training service.
3. The quality assurance date is one year after commissioning. And after that, we will collect the cost if provide repairing for your equipment.
4. Maintenance for equipment failure caused by improper handling (appropriate cost will be collected).
5. We offer the components with favorable price and perdurable maintenance.
6. If equipment repairing is needed after quality assurance date is expired, we will collect maintenance cost.